Excavatoare Pentru Demolări de vânzare
- 2009 Hitachi ZX350LC-3 Demolition ExcavatorAți ascuns acest anunț2009 Hitachi ZX350LC-3 Demolition ExcavatorNeuville-Saint-Amand, Franța€ 79,900 fără TVA
Sodineg France - 1996 Caterpillar 330L Excavator de DemolareAți ascuns acest anunț1996 Caterpillar 330L Excavator de DemolareBöblingen, GermaniaPreț la cerere
Zeppelin Baumaschinen GmbH - 2006 Liebherr R 934B Demolition ExcavatorAți ascuns acest anunț2006 Liebherr R 934B Demolition ExcavatorNeuville-Saint-Amand, Franța€ 25,900 fără TVA
Sodineg France - 1990 Hitachi EX400LC Demolition ExcavatorAți ascuns acest anunț1990 Hitachi EX400LC Demolition ExcavatorNeuville-Saint-Amand, Franța€ 49,900 fără TVA
Sodineg France - Excavator de demolare Liebherr R964CHDS, 2010Ați ascuns acest anunțExcavator de demolare Liebherr R964CHDS, 2010Bornhöved, GermaniaPreț la cerere
BODO Int. GmbH & Co. KG - 1998 Caterpillar 345BL Excavator pe șenileAți ascuns acest anunț1998 Caterpillar 345BL Excavator pe șenileVelddriel, Țările de Jos€ 92,500 fără TVA
Big Machinery B.V.
Caută după marcă
Prețuri pentru Excavatoare pentru demolări
Alegerea tipului potrivit
Ce trebuie verificat înainte de cumpărare
Întrebări frecvente
A high-reach front is built for sustained work at height on multi-storey structures, with the reach, stability and hydraulic capacity engineered in. A standard boom with an extension attachment suits lower structures and shorter, occasional jobs.
Expect a FOPS-rated roof (falling-object protection), polycarbonate front and top screens, and a reinforced cab structure as standard. The exact protection level should match the debris risk of the work, so check the guarding grade against the intended job.
Yes, if it carries a quick-change coupler and hydraulic circuits sized for each tool's flow and pressure needs. Confirm the auxiliary circuit specification matches the attachment set you plan to run, not just the coupler fit.
Look for repair welds, plating, or paint touch-ups around pin bosses and boom joints, and ask for service history. Machines used at maximum reach for long periods show stress there first, so a clean structural record matters.















